Result: Increase equipment lifecycles, operational flexibility improvements, reduced replacement expense
Scope Summary
Cooling Towers
Performed complete mechanical restoration and revisions to existing cooling tower located on elevated structural in roof mechanical room. Work included cell revisions to allow for independent cell operation and maintenance during partial cell operation. Work included
Air Handler Scope
Performed coil replacement and lower casing replacement on 7 custom primary air handlers ranging in size form 60,000CFM to approximately 200,000CFM. Coils were stacked in 5 levels with largest over 20’ long weighing several thousand Lbs. Work was phased to perform on evening shift with equipment to remain operational during occupied hours.
Work included
We take an engineering approach to evaluating and rebuilding equipment and mechanical systems. Our focus is on developing custom engineered solutions to maximize efficiency and value.